A Complete Cab ride on Kuala Lumpur's MRT Kajang Line
The MRT (Mass Rapid Transit) Kajang Line was the second fully
automated driverless train in Malaysia’s capital city of Kuala
Lumpur. The line forms a major part of the Klang Valley Integrated
Transit System and such is its popularity, more lines are being
added. Construction of this line began in July 2011. The line is
numbered 9 and coloured Green on the official transit map. It was
formally known as the Sungai Buloh- Kajang Line (SBK). The line
was opened in 2 stages between December 2016 and July 2017.
Phase 1 between Sungai Buloh and Semantan and Phase 2 between
Muzium Negara and Kajang. The track gauge is 4 feet 8 ½ inches.
The total line length is 47km (29 miles),with 37.5km (23.3 miles)
elevated and 9.5km (5.9 miles) underground. The rolling stock is
provided by Siemens. The Inspiro 4 car units have a passenger
carrying capacity of 1,200 and a top speed of 100km/h.
Total runniong time 73 minutes
Price £17.95